Salaya Mathura Pipeline Project
All Mainline Civil and Mechanical works from Survey/ Grading to till Restoration and NOC including Laying and Proving of HDPE Duct, MOV Installation , Crossings and Installation of Rock Shield for laying of 28” Dia Crude Oil Pipeline in Spread – 4(Rajasthan Section ) for IOCL’s SMPL De-Bottlenecking (DBL) Pilpeline Project.
Owner : Indian Oil Corporation Limited
Main Contractor : Larsen & Toubro Limited
Scope Length : Civil Scope 143 KM and Mechanical Scope 74 KM
Major Scope of Work
ROW Cleaning and Gradinng
Trenching
Rock Blasting
Transportaion of Line Pipe and Stringing
Welding Including NDT
Field Joint Coating and Lowering
Tie-In
Assistance for Hydrotesting, Swabbing and Calliper Pigging
Backfilling
Cleanup and Restoration including Marker Installation
NOC from Farmers as well as Authorities.